CCNP Certification

Level
Total time

CCNP Certification

London College
Logo London College

Need more information? Get more details on the site of the provider.

Starting dates and places

There are no known starting dates for this product.

London College offers their products as a default in the following regions: London

Description

Class room based practical training with free books included and unlimited number of practice hours and mock exams even after you have finished your course.

CCNP Certification

Tutor Led, Practical Oriented and Hands-on Vocational Training

If you have acquired your CCNA certification, you are now eligible for the CISCO intermediate level certification for the networking professional. While you learnt to handle small to medium networks in CCNA, CCNP will equip you with the know-how to handle large networks.

The course stresses the installation and maintenance of large networks, to the tune of 500 and more nodes. The certification is issued after completion of four exams:

CCNP

CISCO ROUTE

CISCO SWITCH

CISCO TSHOOT

After completion of this course, students will be able to manage the administration of WAN and all networks containing CISCO rou…

Read the complete description

Frequently asked questions

There are no frequently asked questions yet. If you have any more questions or need help, contact our customer service.

Class room based practical training with free books included and unlimited number of practice hours and mock exams even after you have finished your course.

CCNP Certification

Tutor Led, Practical Oriented and Hands-on Vocational Training

If you have acquired your CCNA certification, you are now eligible for the CISCO intermediate level certification for the networking professional. While you learnt to handle small to medium networks in CCNA, CCNP will equip you with the know-how to handle large networks.

The course stresses the installation and maintenance of large networks, to the tune of 500 and more nodes. The certification is issued after completion of four exams:

CCNP

CISCO ROUTE

CISCO SWITCH

CISCO TSHOOT

After completion of this course, students will be able to manage the administration of WAN and all networks containing CISCO routers and switches, EtherChannels, Ipv6, QoS and VPNs

CCNP Certification Course Description

CCNP Exam 642-902: CISCO ROUTE

EIGRP based solution, network design and a set of requirements
- Network resources needed for implementing EIGRP on a network 
- Create an EIGRP implementation plan, EIGRP verification plan 
- Configure EIGRP routing 
- Verify EIGRP solution was implemented, Use show and debug commands 
- Document results of EIGRP implementation and verification

Multi-area OSPF Network, given a network design and a set of requirements
- Determine network resources needed for implementing OSPF on a network 
- Create an OSPF implementation plan, OSPF verification plan 
- Configure OSPF routing 
- Verify OSPF solution was implemented properly using show and debug commands 
- Document results of OSPF implementation and verification plan

eBGP based solution, given a network design and a set of requirements
- Determine network resources needed for implementing eBGP on a network 
- Create an eBGP implementation plan 
- Create an eBGP verification plan 
- Configure eBGP routing 
- Verify eBGP solution was implemented properly using show and debug commands 
- Document results of eBGP implementation and verification plan

IPv6 based solution, given a network design and a set of requirements
- Determine network resources needed for implementing IPv6 on a network 
- Create an IPv6 implementation plan, IPv6 verification plan 
- Configure IPv6 routing 
- Configure IPv6 interoperation with IPv4 
- Verify IPv6 solution was implemented properly using show and debug commands 
- Document results of IPv6 implementation and verification plan

IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements
- Create a redistribution implementation plan based upon the results of the redistribution analysis 
- Create a redistribution verification plan 
- Configure a redistribution solution 
- Verify that redistribution was implemented 
- Document results of a redistribution implementation and verification plan 
- Identify the differences between implementing an IPv4 and IPv6 redistribution solution

Layer 3 Path Control Solution
- Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis 
- Create a Layer 3 path control verification plan 
- Configure Layer 3 path control 
- Verify that a Layer 3 path control was implemented 
- Document results of a Layer 3 path control implementation and verification plan 
- Implement basic teleworker and branch services 
- Describe broadband technologies 
- Configure basic broadband connections 
- Describe basic VPN technologies 
- Configure GRE 
- Describe branch access technologies

CCNP Exam 642-813: CISCO SWITCH


Implement VLAN based solution, given a network design and a set of requirements
- Determine network resources needed for implementing a VLAN based solution on a network 
- Create a VLAN based implementation plan 
- Create a VLAN based verification plan 
- Configure switch-to-switch connectivity for the VLAN based solution 
- Configure loop prevention for the VLAN based solution 
- Configure Access Ports for the VLAN based solution 
- verify the VLAN based solution was implemented properly using show and debug commands 
- Document results of VLAN implementation and verification

Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
- Determine network resources needed for implementing a Security solution 
- Create a implementation plan for the Security solution 
- Create a verification plan for the Security solution 
- Configure port security features 
- Configure general switch security features 
- Configure private VLANs Configure VACL and PACL 
- Verify the Security based solution was implemented properly using show and debug commands 
- Document results of Security implementation and verification

Implement Switch based Layer 3 services, given a network design and a set of requirements
- Determine network resources needed for implementing a Switch based Layer 3 solution 
- Create an implementation plan for the Switch based Layer 3 solution 
- Create a verification plan for the Switch based Layer 3 solution 
- Configure routing interfaces Configure Layer 3 Security 
- Verify the Switch based Layer 3 solution was implemented properly using show and debug commands 
- Document results of Switch based Layer 3 implementation and verification

Prepare infrastructure to support advanced services
- Implement a Wireless Extension of a Layer 2 solution 
- Implement a VoIP support solution 
- Implement video support solution

Implement High Availability, given a network design and a set of requirements
- Determine network resources needed for implementing High Availability on a network 
- Create a High Availability implementation plan 
- Create a High Availability verification plan 
- Implement first hop redundancy protocols 
- Implement switch supervisor redundancy 
- Verify High Availability solution was implemented properly using show and debug commands 
- Document results of High Availability implementation and verification

CCNP Exam 642-832: CISCO TSHOOT

Maintain and monitor network performance
- Develop a plan to monitor and manage a network 
- Perform network monitoring using IOS tools 
- Perform routine IOS device maintenance 
- Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer

Troubleshoot
- Multi Protocol system networks
- EIGRP 
- OSPF 
- eBGP 
- routing redistribution solution 
- a DHCP client and server solution 
- NAT 
- first hop redundancy protocols 
- IPv6 routing 
- IPv6 and IPv4 interoperability 
- switch-to-switch connectivity for the VLAN based solution 
- loop prevention for the VLAN based solution 
- Access Ports for the VLAN based solution 
- private VLANS 
- port security 
- general switch security 
- VACL and PACL 
- switch virtual interfaces (SVIs) 
- switch supervisor redundancy 
- switch support of advanced services (i.e., Wireless, VOIP and Video) 
- a VoIP support solution 
- a video support solution 
- Layer 3 Security 
- issues related to ACLs used to secure access to Cisco routers 
- configuration issues related to accessing the AAA server for authentication purposes 
- security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)

The CCNA is required to qualify for CCNP

There are no reviews yet.

Share your review

Do you have experience with this course? Submit your review and help other people make the right choice. As a thank you for your effort we will donate £1.- to Stichting Edukans.

There are no frequently asked questions yet. If you have any more questions or need help, contact our customer service.